EUMETNET

C-SRNWP Programme

 

Report 2005-3:   July - August - September

 

 

Participation at Conferences at Workshops

The Co-ordinator attended during two days the Annual Meeting 2005 of the Consortium COSMO which took place the 20-23 September in Zurich, organised by MeteoSwiss.

This Consortium has re-organised the way it used to work: it has significantly reduced the number of its projects and has defined a tighter controlling.

During this Meeting, a collaboration in the field of Short-range EPS has been finalised between the INM (the NMS of Spain) and COSMO: the INM will also use for its multi-model EPS the Local Model (which is the model of the COSMO Consortium) and COSMO will have access to the results.

 

EU-Project STORMNET-2

13 European NWS - many of them accompanied by a University as sub-partner - have decided to participate to a second submission of the STORMNET Project whose aim is the training of young scientists in very high resolution NWP in a "Research and Training Network" (one of the instruments of the Marie Curie Actions).

As for the first submission, Meteo-France has been the proposer. The dead-line for the submission of the proposal was the 28th of September.

Care has been taken to remodel the weak points of the first proposal (the transfer of knowledge was too weak and the research supervision not clear).

 

Preparation of the SRNWP Annual Meeting

Many interactions took place with the Environmental Agency of Slovenia which will organise this year's EWGLAM/SRNWP Meetings. A large time-slot has been foreseen to discuss the format of these Annual Meetings: is it still adequate?

For the SRNWP Business Meeting Session, the Co-ordinator will present to the delegates the following Agenda:

         The Network of Consortia

         Programme OPERA: Compositing necessary

         EUCOS II (2007 – 2011): Action required

         Soundings: BUFR besides TEMP

         STORMNET

         Model comparison

         Hub for high resolution precipitation observations

         Dissemination of hourly SYNOPs

         GPS Zenital Total Delays

         SRNWP PEPS

         Other points

 

The Actions

Work has progressed in the following two Actions:

- Proposal for a comparison of the four main European operational NWP LAMs for the short-range (in collaboration with the Met Office)

- Proposal for the extension of the ECMWF hub function for the non GTS and non real time precipitation observations.

 

 

OUTLOOK October-November 2005

 

 

Workshops and Meetings

- Participation at the EWGLAM/SRNWP Annual Meeting 2005

   3-5 Oct. in Ljubljana (Slovenia)

- Participation at the "Sixth SRNWP Workshop on Nonhydrostatic Modelling"

31 Oct. - 2 Nov. in Bad Orb (Germany)

- Discussion on the future developments of the SRNWP-PEPS Project

   DWD/Offenbach, beginning of November.

         

EWGLAM/SRNWP Annual Meeting 2005

- Documentation (reports) of this meeting

- Realisation of the measures (resolutions) taken by the Assembly.

 

Actions

- Continuation of the Actions presently in progress.

 

 

 

J. Quiby

C-SRNWP Co-ordinator